ULTIMATE Double-Acting Hydraulic Drilling Jar

ULTIMATE Double-Acting Hydraulic Drilling Jar

UHJDA
ULTIMATE Double-Acting Hydraulic Jar

The advantage of the ULTIMATE Double-Acting Hydraulic drilling jar (UHJDA) is its ability to dramatically increase the allowable overpull force during detent. Our patented “Max Pull During Delay” feature is designed to take advantage of higher tensile forces available on modern rigs and with premium strength drill pipe that is currently used in industry. The proprietary ULTIMATE design can handle significantly higher overpull forces during delay than any other jar in the market.

The UHJDA is a bidirectional drilling jar that incorporates hydraulic delay without a latch mechanism. This allows the operator to apply variable impact in both the up and down directions in highly deviated or high-friction wells where conditions may prevent applying sufficient force to release a mechanical latch.

The ULTIMATE Double-Acting Hydraulic Jar offers the industry's highest max overpull, which gives operators far more jarring force than its competitors.

Feature overview

  • Hydraulically controlled by an internal metering device
    • Ensures consistent delay over the full range of operating temperatures
    • Impact force controlled by operator
  • Jars in both directions
  • Operates via up and down motion
  • Unaffected by right- and left-hand torque
  • Standard seals are suitable for use up to 250ºF (120ºC); optional high temperature seal kits are available for service to 400ºF (200ºC)
  • External sealing surfaces are tungsten-carbide coated to enhance wear and corrosion resistance
Invest in an insurance policy on which you can rely. Equip yourself with the industry-leading overpull strength of a Wenzel Ultimate drilling jar.

Operation

When jarring up:

  • With the jar in neutral position, apply the desired overpull in excess of the free string weight, which will start the hydraulic delay sequence. At the end of the hydraulic delay, the jar will release, causing an upward impact force.
  • If necessary, lower the drill string sufficiently to close the jar to the neutral position and it will be ready to jar up again.

When jarring down:

  • With the jar in the neutral position, lower the drill string to apply the desired down force, which will start the hydraulic delay sequence. At the end of the hydraulic delay, the jar will release, causing a downward impact force.
  • If necessary, raise the drill string sufficiently to open the jar to the neutral position and it will be ready to jar down again.

Hydraulic Mechanical Jars

Our hydraulic mechanical drilling jars provide the reliable hydraulic performance of our other jars with an added mechanical latch that eliminates unexpected jarring during operation and handling.

Jar Placement Utility

The Jar Placement Utility is a software application developed in-house by Wenzel engineers to help drillers optimize the placement of their drilling jars and hydraulic accelerators based on the specific parameters of their run.

Accessories and Customization

Wenzel Downhole Tools M40 mud lubricated bearing assembly with hybrid flex shaft driveline

Different formations, depths and prognoses make a one-size-fits-all approach to drilling tools impossible. Outfit your motor with the housings, driveline, bend and connections that you need for success.

Contact Us

Questions about our products or services? We are here to help.

Fill out the form below to contact our team by email. We will get back to you as soon as possible.

Contact Us

Questions about our products or services? We are here to help.

Fill out the form below to contact our team by email. We will get back to you as soon as possible.